Public Information Centre

Factory Alley Storm Sewer, Waterford, EIS-ENG-22-37

Construction Dates: July to September 2022

Location: Factory Alley, Waterford, ON



Project Scope

The scope of work will consist of the installation of a new storm sewer system. Curb and gutter will be also placed along the east side of Factory Alley to collect stormwater runoff.



Construction Schedule

The construction schedule will be finalized once the project is tendered and awarded to a Contractor. The tentative construction schedule is to start in July 2022 and continue to September 2022.

During the construction of this project, it is our intention to minimize the impact on your everyday life. If any special needs or requirements routinely occur during a day or week, we need to be made aware of them in order that the necessary arrangements can be made so that these needs can continue to be met during construction.






Share Public Information Centre on Facebook Share Public Information Centre on Twitter Share Public Information Centre on Linkedin Email Public Information Centre link

Consultation has concluded

<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>