Notice of Completion

This Study was conducted in accordance with the requirements for Schedule ‘B’ projects within the Municipal Class EA document(as amended in 2015), under the Ontario Environmental Assessment Act.

A Project File Report summarizing the study process and recommendations is available for public review for 30 calendar days from April 26, 2023, to May 26, 2023. The Project File Report will be available for review at the following locations:

On this page
In-person: ServiceNorfolk Counter, 185 Robinson St., Simcoe, 
Phone: 519-426-5870 ext. 0

Interested persons may provide written comments to the following by May 26, 2023:

Mariana Balaban, P.Eng., PhD - Project Director - Norfolk County, Phone: 519-426-5870 ext. 8158, 
Email: mariana.balaban@norfolkcounty.ca

In addition, a request may be made to the Ministry of the Environment, Conservation and Parks for an order requiring a higher level of study (i.e., requiring an individual/comprehensive EA approval before being able to proceed), or that conditions be imposed (e.g., require further studies), only on the grounds that the requested order may prevent, mitigate, or remedy adverse impacts on constitutionally protected Aboriginal and treaty rights. Requests on other grounds will not be considered. Requests should include the requester contact information and full name for the ministry.

Minister of the Environment, Conservation and Parks
Ministry of Environment, Conservation and Parks
777 Bay Street, 5th Floor
Toronto ON M7A 2J3
Email: minister.mecp@ontario.ca

and

Director, Environmental Assessment Branch
Ministry of Environment, Conservation and Parks
135 St. Clair Ave. W, 1st Floor
Toronto ON, M4V 1P5
Email: EABDirector@ontario.ca

Accessible formats and communication supports available upon request.

Personal information collected on this subject is collected under the authority of the Freedom of Information and Privacy Act, the Municipal Act, and the Environmental Assessment Act. With the exception of personal information, all comments and information received will be maintained on file for use during the project and may be included in project documentation.


Share Notice of Completion on Facebook Share Notice of Completion on Twitter Share Notice of Completion on Linkedin Email Notice of Completion link

Consultation has concluded

<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>