Notice of Completion
This Study was conducted in accordance with the requirements for Schedule ‘B’ projects within the Municipal Class EA document(as amended in 2015), under the Ontario Environmental Assessment Act.
A Project File Report summarizing the study process and recommendations is available for public review for 30 calendar days from April 26, 2023, to May 26, 2023. The Project File Report will be available for review at the following locations:
On this page In-person: ServiceNorfolk Counter, 185 Robinson St., Simcoe, Phone: 519-426-5870 ext. 0
Interested persons may provide written comments to the following by May 26, 2023:
Mariana Balaban, P.Eng., PhD - Project Director - Norfolk County, Phone: 519-426-5870 ext. 8158, Email: mariana.balaban@norfolkcounty.ca
In addition, a request may be made to the Ministry of the Environment, Conservation and Parks for an order requiring a higher level of study (i.e., requiring an individual/comprehensive EA approval before being able to proceed), or that conditions be imposed (e.g., require further studies), only on the grounds that the requested order may prevent, mitigate, or remedy adverse impacts on constitutionally protected Aboriginal and treaty rights. Requests on other grounds will not be considered. Requests should include the requester contact information and full name for the ministry.
Minister of the Environment, Conservation and Parks Ministry of Environment, Conservation and Parks 777 Bay Street, 5th Floor Toronto ON M7A 2J3 Email: minister.mecp@ontario.ca
and
Director, Environmental Assessment Branch Ministry of Environment, Conservation and Parks 135 St. Clair Ave. W, 1st Floor Toronto ON, M4V 1P5 Email: EABDirector@ontario.ca
Accessible formats and communication supports available upon request.
Personal information collected on this subject is collected under the authority of the Freedom of Information and Privacy Act, the Municipal Act, and the Environmental Assessment Act. With the exception of personal information, all comments and information received will be maintained on file for use during the project and may be included in project documentation.
Consultation has concluded