Growth Management Study

Share on Facebook Share on Twitter Share on Linkedin Email this link

To ensure that Norfolk County plans for efficient growth over the long term, the Planning Department is embarking on a Growth Management Study that will establish long-term growth management principles as well as identify opportunities and options to consider to accommodate a made in Norfolk vision of growth to 2048.

To ensure that Norfolk County plans for efficient growth over the long term, the Planning Department is embarking on a Growth Management Study that will establish long-term growth management principles as well as identify opportunities and options to consider to accommodate a made in Norfolk vision of growth to 2048.

  • Special Council Meeting - Agenda and Report now available

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    A Special Meeting of Council has been scheduled in relation to the County updating the Official Plan as a part of the Municipal Comprehensive Review pursuant to Section 26 of the Planning Act:

    Date: Tuesday, April 16, 2024 at 8:30 a.m.

    Place: Norfolk County Administration Building, 50 Colborne Street South, Simcoe Ontario.

    The agenda, including the staff report, is now available: HTML & PDF

    Those wishing to present should email GROWNorfolk@norfolkcounty.ca or fill out a deputation form here.

    Written comments can also be provided via email by sending the comments to GROWNorfolk@norfolkcounty.ca

  • Individual Pass 1 Criteria Packages now available for Property Owners with Requests

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    As a part of the comprehensive review process, settlement boundaries for the urban areas are currently being evaluated. A two-pass system was established as part of the evaluation process of the proposed expansion lands. Lands were first assessed as individual parcels and second through a community analysis to evaluate known advantages or disadvantages that could be identified at the community scale that were not obvious through first pass component that occurred on a site-by-site basis.

    The first portion of the evaluation was based on criteria established by the project technical team. The technical team convened over multiple days to confirm critical factors linked to the project’s overall theme, which itself was derived from the Provincial Policy Statement, 2020; the goals and objectives laid out in Norfolk County’s Official Plan; the project themes approved through the Terms of Reference and various technical papers (Volumes 1 to 6) and fine-tuned with the guidance of the 2022-2026 Strategic Plan, Our Future Norfolk. Those factors were then paired with metrics predominantly based on geospatial data. These metrics were universally applied to the identified candidate parcels to provide an overall score, which then provided an initial ranking for further evaluation through pass 2.

    Through the stakeholder meetings held following the Public Information Centre (PIC) on February 8, 2024, additional feedback was collected regarding individual parcels and interest in the evaluation process components. In response to the requests for the Pass 1 data at those meetings, staff have formatted and packaged the individual parcel scores for stakeholders to review.

    Staff would like to reiterate the draft nature of the proposed boundary expansions outlined in the PIC and that the reports and recommendations that will be part of the Special Council Meeting on April 16, 2024, will provide the formalized recommendations of staff, including consideration of the feedback that was collected following the PIC.

    Property owners and their representatives can request a copy of their criteria score information by emailing GROWNorfolk@NorfolkCounty.ca.

  • Special Council Meeting - Upcoming on April 16, 2024

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    A Special Meeting of Council has been scheduled in relation to the County updating pursuant to Section 26 of the Planning Act:

    Date: Tuesday, April 16, 2024 at 8:30 a.m.

    Place: Norfolk County Administration Building,

    50 Colborne Street South, Simcoe Ontario.

    Location of Lands Affected: All Lands Within Norfolk County (no key map provided)


    The Purpose and Effect of the Official Plan Amendment:

    This proposed growth management Official Plan Amendment (OPA) has been prepared in association with the County’s Municipal Comprehensive Review to bring the County Official Plan into consistency with the Planning Act, to ensure that it has appropriate regard for matters of Provincial interest, and is consistent with the Provincial Policy Statement, 2020.

    This proposed OPA represents the first of two amendments to the existing County Official Plan that will establish where and how growth is to occur in the County to 2048 that will, among other matters:

    • Update policies in relation to growth forecasts (population and employment), growth targets such as density requirements, and types of developments;
    • Identify locations for settlement area boundary expansions (Urban Areas only in this phase) including updating policies and mapping schedules;
    • Identify changes to Protected Industrial locations including updating policies and mapping schedules;
    • Include potential rationalizations of Urban Area boundaries to remove any land that would no longer be considered as part of an urban area and not developed for urban uses;
    • Provide policy direction for the future planning, land use designation amendments and servicing strategies for any lands to be added to the settlement boundary;
    • Provide policy updates related to requirements for new development within any new area; and
    • Implement other recommendations from the GROW Norfolk Study and municipal comprehensive review.


    Additional information regarding the proposed Official Plan Amendment is available to the public for inspection at the Planning Department, Norfolk County, 185 Robinson Street, Suite 200, Simcoe, N3Y 5L6 between 8:30 a.m. and 4:30 p.m., Monday to Friday or by calling 519-426-5870 x. 1842 or by emailing GrowNorfolk@NorfolkCounty.ca. The Planning Report regarding the proposed Amendment is available online the Friday prior to the Special Meeting of Council on April 16, 2024 by following the path and selecting Agendas, Public Meeting and select the date of the meeting: norfolkcounty.ca/government/agendas-minutes.

  • Supplemental Evaluation Criteria Document

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    The Public Information Centre held by Planning staff on February 8, 2024 provided an opportunity for the public to view a presentation and review draft proposed urban boundary expansion concepts.

    As a part of the presentation, the specific policy and evaluation criteria categories used by the technical team as part of the comprehensive process to review all potential land parcels being considered as part of this process were presented.

    To supplement the information provided during the presentation (and available on a copy of the presentation slides here on Engage Norfolk), the project team has also prepared a compendium document that provides further information about the evaluation criteria in hopes of supporting ongoing discussions with and feedback from the public: Supplemental Evaluation Criteria Document

    The project team looks forward to future discussions with members of the public on this project. Timeslots for meeting with staff are now closed.

  • Couldn't make it to the Public Information Centre? No problem! Learn more here!

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    View a copy of the slides presented on February 8, 2024 here: Presentation

    Want to set up a meeting with staff? Click here.

    View maps of proposed changes:

    Draft Proposed Protected Industrial Designation Changes

    Draft Proposed Urban Boundary Expansions

  • Public Information Centre - February 8

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Norfolk County is updating its Official Plan pursuant to Section 26 of the Planning Act. The primary purpose is to conform to the Provincial Policy Statement, to implement the recommendations of the GROW Norfolk Study and its related components and to complete the municipal comprehensive review. The proposed changes will help ensure that the County adequately plan for growth. The future amendment will apply County-wide.

    A Public Information Centre is being held on:

    Purpose: Norfolk County Official Plan Amendment

    Date: Thursday, February 8, 2024

    Time: 4:30 PM to 6:30 PM with a brief presentation at 4:45 PM and closing remarks at 6:15 PM

    Location: Multipurpose Room, Talbot Gardens, 10 Talbot St N, Simcoe, ON

    The Purpose and Effect of the Future Official Plan Amendment:

    The future Official Plan Amendment (OPA) will be prepared in association with the County’s Municipal Comprehensive Review to bring the County Official Plan into conformity with the Provincial Policy Statement, to ensure that it has appropriate regard for matters of Provincial interest, and is consistent with the Provincial Policy Statement, 2020.

    The effect of the proposed amendment to the Norfolk County Official Plan is to occur in two phases. The first phase is intended to include:

    • Policy updates in relation to growth forecasts (population and employment), growth targets such as density requirements, and types of developments
    • Identify locations for settlement area boundary expansions (Urban Areas only in this phase) including updating policies and mapping schedules
    • Identify changes to Protected Industrial locations including updating policies and mapping schedules
    • Potential rationalizations of Urban Area boundaries to remove any land that would no longer be considered as part of an urban area and not developed for urban uses.
    • Policy direction for the future planning, land use designation amendments and servicing strategies for any lands to be added to the settlement boundary
    • Policy updates related to requirements for new development within any new area,
    • Implement other recommendations from the GROW Norfolk Study and municipal comprehensive review:

    Second phase of the proposed official plan amendment is intended to include:

    • Completion of Land Evaluation and Area Review with policy updates pertaining to a new land use designation such as rural land uses.
    • Recommendations pertaining to hamlet settlement areas and rural lands.
    • Recommendations regarding policies and land use designations pertaining to Natural Heritage features and Hazard Lands.
    • Other Provincial Policy Statement conformity policy and/or schedule amendments.

    Can't make it in person?

    We understand that busy schedules mean that this date and time may not work for everyone. Following the live public information centre, a video recording and a copy of the presentation on this page. You can also provide written comment by emailing staff at GrowNorfolk@norfolkcounty.ca or mailing the Planning Department at 185 Robinson Street, Simcoe, Ontario, Canada, N3Y 5L6

  • Volume 5: Land Evaluation and Area Review & Volume 6: Preferred Directions and Recommendations Report to Council-in-Committee

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Staff will be presenting on Volume 5: Land Evaluation and Area Review & Volume 6: Preferred Directions and Recommendations to Council-in-Committee on November 15, 2023.

    Links to the agenda can be found here: HTML & PDF

    Members of the public are welcome to attend the meeting or can also watch the meeting live through the County's meeting streaming page: Watch Norfolk County Meetings.

  • GROW Norfolk Public Information Centre - August 15, 2023

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    What will Norfolk be like in the year 2051? Norfolk is expected to grow as a community, but where will everyone live? What kind of housing will people want to live in? What modes of transportation will people use to get necessities? How will agricultural lands and natural heritage features be protected long term? Norfolk County invites you to take part in the Grow Norfolk study to evaluate and give feedback on how growth and development can best benefit the community.

    Date: Tuesday, August 15, 2023

    Time: 5:00 PM to 7:00 PM with a brief presentation at 5:30 PM and closing remarks at 6:45 PM

    Location: Dogwood Room, Simcoe Recreation Centre, 182 South Dr, Simcoe, ON

    Why Attend?

    Information will be provided about the Grow Norfolk study and the following topics:

    • Population and Employment Forecasts

    • Current Land Supply

    • Growth Options

    • Introduction to the Agricultural Lands Study (Land Evaluation and Area Review or LEAR study)

    This Grow Norfolk event is a great opportunity to have your say: Share your thoughts, ideas and concerns about the future development and growth of the County

  • What is a Growth Management Study?

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    supporting image

    A growth management study provides guidance on where to direct growth within a municipality to accommodate the projected population and economic growth over the planning horizon.

    The study is considered a comprehensive review that will be utilized during the next five-year Official Plan review process or development of a new Official Plan.


    What’s included in the study?

    Included in the study are:

    • Historic population and economic growth
    • Number and type of building permits issued
    • Existing land supply
    • Infrastructure system and capacity
    • Overarching policy framework
  • Norfolk County Workplan and Project Timeline

    Share on Facebook Share on Twitter Share on Linkedin Email this link


    Phase 1

    Phase 1: Project Initiation

    • Project Kick-Off
    • Terms of Reference
    • Engagement Strategy

    Phase 2A

    Phase 2A: Policy Review & Technical Reports

    • Context Report
    • Planning Act and PPS Conformity Exercise
      • Includes a review of Short Term Rentals and Accessory Residential Dwelling Units
    • Land Evaluation Study

    Phase 2B

    Phase 2B: Growth Projections

    • Watson & Associates are completing the growth projections.

    Phase 3

    Phase 3: Opportunities & Options

    • Conformity Recommendations
    • Option Reports & Land Study
    • Monitoring Options

    Phase 4

    Phase 4: Preferred Direction Reports

    • Policy Recommendations
    • Monitoring Details
    • Amendments, if required


Page last updated: 11 Apr 2024, 02:51 PM